Mill Down Overlay Support Rings

Tyson Morrie | Advanced Portable Machining | https://advancedportablemachining.ca/

192″ support ring inside of vessel 5′ down. The ring was overlayed with stainless and needed to be machined down to spec. Foot supports were built as the CM6200 was past the max clamping distance. Each cut took 1 hour to complete. 3 rings to complete, 18-day job.